-- Rising digitization in the business world as well as demand for highly resilient data management services have resulted into increased demand for data center services across Europe. Mercury Engineering, LZ technologies, SISK Groups, Kedington and Jones Engineering Group are among the major players operating in this market. Europe, being a technologically advanced region along with high number of small and large enterprises, is anticipated to witness significantly high adoption of data centers by various organizations. Data center construction market is expected to grow from US$ 9,558 Million in 2016 to US$ 22,829.1 Million by 2025 at a CAGR of 10.3% between 2017 and 2025.
Complete research report is available at http://www.theinsightpartners.com/reports/data-center-construction-market-research-report
The report focuses on in-depth segmentation of this market segmented by design type, across the European region. The geographic segmentation of the report covers seven major countries including; Germany, France, Ireland, Denmark, Netherlands, England, and Belgium. By design type, Electrical desin accounted for the largest share of the data center construction market in 2016.
The report aims to provide an overview of European data center construction market with detailed market segmentation. Also, it analyzes the current data center construction market scenario and forecasts the market till 2025. The report covers market dynamics effecting the market during the forecast period. Furthermore, the report analyzes the competitive scenario, geographic trends, and opportunities in the markets with respect to all geographic regions. The report also includes the detailed company profiles of the key players in the market along with their market strategies. The report also provide PEST analysis for the European region, and SWOT analysis for all companies profiled within the scope of this report.
UK is one of the prominent countries in European data center construction market which will contribute highest revenue, due to technological developments and considerable implementation of data centers by numerous organizations. Amongst all major European countries, Ireland is expected to grow at the highest CAGR during the forecast period. Moreover, presence of big tech-giants in Ireland, is one of the major reason behind the availability of highly educated, and flexible workforce for data center construction market.
Some of the key players of data center construction market in Europe include ISG plc, Arup Group, John Sisk & Son, Jones Engineering Group, Jacobs, Mace Group and others.
Request for a sample of this research report at http://www.theinsightpartners.com/sample/TIPTE100000384
Major Points from Table of Content
5 Europe Data Center Construction Market – Key Industry Dynamics
5.1 Key Market Drivers
5.1.1 Rapidly increasing data traffic
5.1.2 The General Data Protection Regulation (GDPR)
5.1.3 High EBITDA margins in the infrastructure sector
5.2 Key Market Restraints
5.2.1 Complex infrastructure
5.2.2 Emergence of containerized data centers
5.3 Key Market Opporunities
5.3.1 Growth in Green Data Centers
5.3.2 Constant growth in number of data centers construction
5.4 Future Trends
5.5 Impact Analysis of Drivers and Restraints
6 Data Center Construction Market Analysis – Europe
6.1 Europe Data Center Construction Market Overview
6.2 Europe Data Center Construction Market Forecast and Analysis
7 Europe Data Center Construction Market– By Design Type
7.1 Overview
7.2 Electrical Design
7.2.1 Overview
7.2.2 Europe Electrical Design Market Revenue and Forecasts to 2025 (US$ Mn)
7.2.2.1 UPS
7.2.2.1.1 Overview
7.2.2.1.2 Europe UPS Market Revenue and Forecasts to 2025 (US$ Mn)
7.2.2.2 Generators
7.2.2.2.1 Overview
7.2.2.2.2 Europe Generators Market Revenue and Forecasts to 2025 (US$ Mn)
7.2.2.3 PDU
7.2.2.3.1 Overview
7.2.2.3.2 Europe PDU Market Revenue and Forecasts to 2025 (US$ Mn)
7.2.2.4 Transfer Switchgear
7.2.2.4.1 Overview
7.2.2.4.2 Europe Transfer Switchgear Market Revenue and Forecasts to 2025 (US$ Mn)
7.2.2.5 Others
7.2.2.5.1 Overview
7.2.2.5.2 Europe Others Market Revenue and Forecasts to 2025 (US$ Mn)
7.3 Mechanical Design
7.3.1 Overview
7.3.2 Europe Mechanical Design Market Revenue and Forecasts to 2025 (US$ Mn)
7.3.2.1 HVAC
7.3.2.1.1 Overview
7.3.2.1.2 Europe HVAC Market Revenue and Forecasts to 2025 (US$ Mn)
7.3.2.2 Other Cooling Equipment
7.3.2.2.1 Overview
7.3.2.2.2 Europe Other Cooling Equipment Market Revenue and Forecasts to 2025 (US$ Mn)
7.4 General Construction
7.4.1 Overview
7.4.2 Europe General Construction Market Revenue and Forecasts to 2025 (US$ Mn)
Purchase a copy of this research report at http://www.theinsightpartners.com/buy/TIPTE100000384
8 Europe Data Center Construction Market – Country Analysis
8.1 Overview
8.2 The Netherlands Data Center Construction Market Revenue and Forecasts to 2025
8.2.1 Overview
8.2.2 The Netherlands Data Center Construction Market Revenue and Forecasts to 2025 (US$ Mn)
8.3 Germany Data Center Construction Market Revenue and Forecasts to 2025
8.3.1 Overview
8.3.2 Germany Data Center Construction Market Revenue and Forecasts to 2025 (US$ Mn)
8.4 England Data Center Construction Market Revenue and Forecasts to 2025
8.4.1 Overview
8.4.2 England Data Center Construction Market Revenue and Forecasts to 2025 (US$ Mn)
8.5 Ireland Data Center Construction Market Revenue and Forecasts to 2025
8.5.1 Overview
8.5.2 Ireland Data Center Construction Market Revenue and Forecasts to 2025 (US$ Mn)
8.6 Denmark Data Center Construction Market Revenue and Forecasts to 2025
8.6.1 Overview
8.6.2 Denmark Data Center Construction Market Revenue and Forecasts to 2025 (US$ Mn)
8.7 Belgium Data Center Construction Market Revenue and Forecasts to 2025
8.7.1 Overview
8.7.2 Belgium Data Center Construction Market Revenue and Forecasts to 2025 (US$ Mn)
8.8 France Data Center Construction Market Revenue and Forecasts to 2025
8.8.1 Overview
8.8.2 France Data Center Construction Market Revenue and Forecasts to 2025 (US$ Bn)
Inquire for discount copy at http://www.theinsightpartners.com/discount/TIPTE100000384
List of Tables
Table 1: Europe Data Center Construction Market Revenue and Forecasts to 2025 (US$ Mn)
Table 2: Europe Data Center Construction Market Revenue and Forecasts to 2025 – By Design Type (US$ Mn)
Table 3: Europe Data Center Construction Market Revenue and Forecasts to 2025 – By Electrical Design (US$ Mn)
Table 4: Europe Data Center Construction Market Revenue and Forecasts to 2025 – By Mechanical Design (US$ Mn)
Table 5: Glossary of Terms, Data Center Construction Market
Contact Info:
Name: Sameer Joshi
Email: Send Email
Organization: The Insight Partners
Address: Pune, India
Phone: +1-646-491-9876
Website: http://www.theinsightpartners.com
Release ID: 199977

Google
RSS