The company’s Osprey PowerPlatform® is designed to reduce the cost per watt for ground-mounted solar installations, ensuring Texas-based EPCs can maximize their profits without increasing their staff or machinery requirements.
Further details are available at https://nuanceenergy.com/solar-blog/the-faster-smarter-and-cheaper-way-to-install-ground-mounted-solar
Nuance Energy’s racking system's easy-install design means that a three-person team, using only handheld tools, can fully assemble a unit in under an hour. The Osprey PowerPlatform® therefore allows EPCs to significantly save on labor costs by eliminating the need for highly trained specialist installation crews.
Texan EPCs can further save on on-site preparation costs, as each Osprey PowerPlatform® unit comes with earth anchors to provide all the necessary support and stability. This removes the need for lengthy geotechnical reports, inspections, and excavations before commencing the physical rack installation phase of the project.
Total installation time is also significantly reduced, saving EPCs the run-on costs associated with missed deadlines. The company states that the average installation time for a traditional 2MW ground-mounted solar system is approximately 60 days when using a large team. However, using Nuance Energy’s Osprey PowerPlatform®, the same installation could be completed in under 16 days. This shorter project timeline enables crews to install more solar systems within the same timeframe, increasing EPCs' sales opportunities and boosting revenues.
Nuance Energy’s Osprey PowerPlatform® frame system, therefore, overcomes the most common and costly hurdles EPCs face when installing ground-mounted solar panels. By eliminating the need for geotechnical reporting, excavations, and large crews of specialized staff, the cost per watt for each project is substantially reduced, creating a more consistent and reliable cash flow.
"In residential projects, we might see a total project cost of $60,000, and our portion of that might be around $8,000, primarily in materials,” said a spokesperson for Nuance Energy. “For commercial projects, the total project size might range from $10,000 to $1 million, but our system keeps costs per watt consistently low by minimizing labor and equipment expenses."
EPCs based in the Lone Star State can find out more about reducing installation costs for ground-mounted solar racking with Nuance Energy’s Osprey PowerPlatform® at https://nuanceenergy.com/solar-blog/the-faster-smarter-and-cheaper-way-to-install-ground-mounted-solar
Contact Info:
Name: Brian C. Boguess
Email: Send Email
Organization: Nuance Energy Group Inc
Address: 2252 North 23rd Drive, Phoenix, Arizona 85009, United States
Phone: +1-877-537-2221
Website: https://nuanceenergy.com/
Release ID: 89142678